(847) 512-3228

Clark Memorial Hospital

120kW of A/B UPS capacity and design included General office/IT support space. Non-raised floor environment with VESDA and ECARO 25 detection/suppression. Space utilized was adjacent to active doctor offices so dust mitigation during construction was more critical than typical.

Services Provided during this engagement:

  • Engineering Design
  • Project Management
  • Systems Testing & Commissioning
1051

TMI is very structured in their analysis of the project and holds the team to the best results. They are conscientious and provides input where requested as to the final results of the project.

Fred Horlander, Vice-President Support Services

Our Portfolio

CHRISTUS Health

A Tier III greenfield project in San Antonio, TX

Northrop Grumman

Since 1998, TMI has been a mission critical provider nationally

Kellogg’s

88,000SF building in Oak Brook, IL designed for corporate IT needs.

Clark Memorial Hospital

Non-Raised floor environment in Louisville, KY.