Clark Memorial Hospital
120kW of A/B UPS capacity and design included General office/IT support space. Non-raised floor environment with VESDA and ECARO 25 detection/suppression. Space utilized was adjacent to active doctor offices so dust mitigation during construction was more critical than typical.
Services Provided during this engagement:
- Engineering Design
- Project Management
- Systems Testing & Commissioning
TMI is very structured in their analysis of the project and holds the team to the best results. They are conscientious and provide input where requested as to the final results of the project.